Construction formwork - メーカー・企業と製品の一覧

Construction formworkの製品一覧

1~2 件を表示 / 全 2 件

表示件数

Grip Frame PAT for Frame Construction Method

Removing the retained rebar is also easy! The rebar is sandwiched between the hoop bars from the top and bottom directions, ensuring a secure hold.

The "Grip Frame PAT" is a formwork designed for frame construction that easily secures the position of rebar. By sandwiching the rebar between hoop bars from the top and bottom, it is held firmly in place. Once secured, the rebar is less likely to shift. Removing the secured rebar is also simple. It can be firmly held again when re-sandwiched. 【Features】 ■ Easily secures the position of rebar ■ Once secured, the rebar is less likely to shift ■ Removing the secured rebar is easy ■ Simple and efficient to work with ■ Made from the same materials as conventional hoop bars for peace of mind *For more details, please refer to the PDF document or feel free to contact us.

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

Kaiser Void Slab Method

Achieve a refreshing space! It is possible to enhance the rigidity of the slab without increasing the weight.

The "Kaiser Void Slab Method" is a void slab construction method that arranges polystyrene void forms within the slab cross-section. Truss-reinforced half PCa panels with the void forms attached are laid out at the construction site, and the upper portion is constructed to create the floor. This method allows for an increase in slab rigidity without increasing slab weight, achieving a clean space without small beams. [Applications] - Trusses - Floor slabs - Half PC *For more details, please refer to the related links or feel free to contact us.

  • 1-2.jpg
  • 1-3.jpg
  • Wood panel and frame wall construction

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録